Restoration in Pembroke Pines
Pembroke Pines takes permits through its EnerGov Development Hub, and the portal closes after submission until the review cycle ends, so every required document goes up with the application. Corrections happen in person at the permit counter. Pembroke Pines' Building Department is at the Charles F. Dodge City Center, 601 City Center Way, 2nd Floor, (954) 435-6502, with building questions to PinesPermits@cgasolutions.com. The Building Fee Schedule adopted October 1, 2025 under s. 150.16 lists single-family residential demolition at $124.42 per structure per trade.
Trade permits carry a per-trade minimum up to $5,000 of cost, and 2.50% above that. The department enforces the Florida Building Code, Broward County ordinances and City ordinances. It prints no code edition. The Storm & Flood Information page says some flood protection methods require a construction permit and takes flood problem reports at 954-518-9040. It gives no post-storm repair guidance and no 50 percent substantial damage figure. Through Broward County, Pembroke Pines comes under the High-Velocity Hurricane Zone.
According to the ACS, the median year built is 1992, and AE and AH zones from FEMA reach the boundary. Up to $2,500, a repair is a flat $124.42 per structure per trade, and above $2,500 it's charged 3.79% of construction cost.
What restoration costs near Pembroke Pines
Nobody has quoted us a restoration job in Pembroke Pines, so the page carries no city price. The Florida page shows the estimates beside what the nearest federal occupation is paid ($21.70 an hour in the BLS wage data, which is pay, not price). How we estimate costs.
Permits for restoration work in Pembroke Pines
When repairs touch the structure or the electrical, plumbing or mechanical systems, they usually need a permit from your city or township building department, so ask the company which of you pulls it.
Restoration jobs in Pembroke Pines
Sources for Pembroke Pines
- City of Pembroke Pines: Building Fee Schedule Read Oct 24, 2026.
- City of Pembroke Pines: The Building Department Read Oct 24, 2026.
- City of Pembroke Pines: Building Department FAQs Read Oct 24, 2026.
- Storm & Flood Information Read Oct 24, 2026. Check with the source before you rely on this.
- FEMA National Flood Hazard Layer, Flood Hazard Zones Check with the source before you rely on this.
- Florida Building Commission, Florida Building Code: High-Velocity Hurricane Zone (Miami-Dade and Broward Counties) Check with the source before you rely on this.
- ACS 5-year B25035 Median Year Structure Built Check with the source before you rely on this.